CAD-BOM synchronization using OpenBOM

Oleg Shilovitsky
Oleg Shilovitsky
25 June, 2019 | 4 min for reading
CAD-BOM synchronization using OpenBOM

One of the questions often asked by OpenBOM users and customers is how OpenBOM is merging data between CAD systems and Bill of Materials in OpenBOM. After talking to many users, I thought I’m ready now to write an article to summarize it and also clarify some potential misunderstanding.

To start with, I’m talking about the situation when we have OpenBOM CAD plug-in used for one of the available CAD integrations. In such a case, we do have CAD integration (running on the desktop or cloud) and OpenBOM running independently.

Here is an example of Solidworks OpenBOM plug-in installed in Solidworks desktop system

The question is what happens when you create a BOM for the first time? And what happens when you create/update BOM one more time? Will OpenBOM check all BOM parts and create a difference? How comparison of the data is done? What is the procedure?

This is a great question. At OpenBOM we call it “Merging”.  That’s the act of updating an existing BOM (or catalog) from CAD.  In a nutshell, here is what happens:

When you click Create/Update BOM from the CAD system, we look to see if a BOM already exists in OpenBOM.  If not we create one. Done.

If a BOM does exist:

1) We update the items (parts/assemblies) by part number in the BOM with values from the CAD system.  So, if you have CAD part with the part number (or name) ABC and we extracted 10 properties from CAD for that Part Number (FileName), then on the update, we would re-write (overwrite) those 10 properties from CAD to the BOM.  This ensures that any changes made to any part/assy properties in CAD are written to the BOM on update.

2) If you added properties (columns) in OpenBOM (which do not exist in CAD) we do nothing.  So, if you added Cost to your BOM and we updated from CAD, we would NOT change Cost. It (and any other properties added to the BOM) are untouched.  This ensures that any properties or values which are mastered in the BOM (eg. added in the BOM) are NEVER overwritten by CAD update.

3) If you add a line to the BOM.  Let’s say for “Glue” or ‘Tape” or some other item which is not in CAD.  We do nothing on Create/Update. This ensures any items you ADD to the BOM are persistent and will remain in the BOM following a CAD update.

4) If you Remove an item from the BOM which was created as a result of CAD. (in other words, it is in CAD), then run an update, OpenBOM will recreate that item in the BOM.  So, if the part number exists as a CAD part, and you create/update a BOM, you will get the same part number. Even if you had previously removed it from the BOM. If you wish to more permanently remove it from the BOM, the best way is to remove it from the BOM then mark it in CAD as “Do not show in BOM” so it will not come back on the next Create/Update BOM operation.

Here is a typical scenario of working with CAD plug-in and OpenBOM:

  1. Create the BOM
  2. Don’t change the data in the BOM which is mastered in CAD (it will be overwritten during the update)
  3. Use Add property command (apply to all level) if you need more column (like Cost, etc.)
  4. Run Create/Update BOM command from CAD plug-in to routinely update that BOM.

The following video can give you an example of using OpenBOM for Solidworks

Conclusion.

OpenBOM gives you a very flexible and powerful way to integrate any CAD system and information from the CAD system and convert it into the online bill of materials. Moreover, OpenBOM will keep the information in sync all the time and allows you to streamline design to the manufacturing process.

For more information about OpenBOM CAD integrations, check OpenBOM Integrations.

Best, Oleg

PS. Let’s get to know each other better. If you live in the Greater Boston area, I invite you for a coffee together (coffee is on me). If not nearby, let’s have a virtual coffee session — I will figure out how to send you a real coffee.

Want to learn more about PLM? Check out my Beyond PLM blog and PLM Book website

Related Posts

Also on OpenBOM

4 6
17 April, 2026

Threaded at ACE 2026 by Aras: A Startup Space That Changed the Tone Earlier this week, I went to Miami,...

16 April, 2026

Part numbering sounds simple until a design project starts to grow. At the beginning, many teams use whatever feels convenient....

15 April, 2026

A bill of materials is one of the most important records in any manufacturing business. It defines what goes into...

13 April, 2026

AI-Powered CAD File Management Beyond PDM Engineering teams create an enormous amount of knowledge in the course of building a...

12 April, 2026

A bill of materials is where product definition begins. Creating a bill of materials is a collaborative effort that typically...

10 April, 2026

Every time an engineer opens a product data management system, they face a small but real cognitive task before any...

10 April, 2026

OpenBOM will be presenting at Threaded in Miami, the startup gathering space hosted by Aras ACE 2026 at the Hilton...

9 April, 2026

In manufacturing, quality standards are not optional. They shape product quality, customer satisfaction, regulatory compliance, and the overall success of...

9 April, 2026

I’m coming to Share PLM Summit 2026, taking place on May 19–20 in Jerez de la Frontera, Spain. It the...

To the top