WEBINAR About Revision Management and What is Next in OpenBOM Revision Mechanism

Oleg Shilovitsky
Oleg Shilovitsky
18 February, 2020 | 3 min for reading
WEBINAR About Revision Management and What is Next in OpenBOM Revision Mechanism

The Bill of Materials is a fundamental part of product development. Traditionally, CAD and design were considered as a source of all product information. But this status quo is changing fast as product development is moving into a multi-discipline zone. None of the modern products are purely mechanical products. Each product today includes some electrical parts, electronic, embedded and cloud software. Even the most sophisticated MCAD is not capable to manage an entire structure of the information about the product. 

And this is a place where OpenBOM is coming and proposing very simple, yet flexible and reliable recipe management capable to include multi-disciplinary item data management (OpenBOM catalogs) and Bill of Materials (parent-child relationships). 

Read more about OpenBOM data management in this online article – OpenBOM data management fundamentals. You will learn about to main models of OpenBOM  – reference/instance model and parent-child relationships. 

Check this model for reference/instance.

Today, I want to talk about a very important enhancement we are planning to make in OpenBOM revision management mechanism.

Current OpenBOM revisions are immutable snapshots that capable to store a baseline of BOMs. A Bill of Materials in the OpenBOM model considered a flat list of items. Each item can potentially point on another BOM (Part Number) and by doing so, parent-child relationships are unfolding.  

OpenBOM Parent-Child Relationships are built using Part Numbers. You can think about them as fully interchangeable parts. A history of assembly (BOM) revisions and part revisions is fully preserved. The limit of this model is to manage relationships between assembly (BOM) revisions. And this is what we are going to fix. 

Think about the following structure (each item in this structure has Part Number): 

However, this structure lack some of the capabilities – a way to interlink a parent with a specific revision and a child of a specific revision. Now, let’s add revisions to this structure. This is an example of what you’re going to see 

The revision process can happen bottom-up and top-down. Below is one example of a simple scenario when sub-assembly was revisioning first and later was included in the revision of the top assembly. 

OpenBOM first set of revision model enhancements will be coming in the next release. Stay tuned. More information will be available soon. 

Meantime, I want to invite you to attend the OpenBOM weekly educational webinar about revision management. The webinar will take place this Wednesday at 2 pm Eastern U.S. time. 

Subject: BOM Revisions – Methods to get started managing revisions of Bills of Materials

When: Wed, Feb 19, 2020 2:00 PM – 3:30 PM EST

REGISTRATION LINK

Managing revisions of items and bill of materials can be a challenging task, especially for complicated multi-level BOMs.  Join me, Steve Hess, OpenBOM Director of User Experience in a discussion of BOM revision management. We will examine the various methods and theories used in keeping track of individual BOM revisions, Part revision and connecting them together in a meaningful and understandable way. We will be answering that age-old questions “What components went into a particular revision of my product?”

Conclusion.

To manage the Bill of Materials and all its revision is a complex task. Nothing is simple about revision management in BOMs. But, at OpenBOM we are focusing on how to make this process easy and simple. 

Please follow our revision model development and future articles. If you’re interested to share your experience or bring some feedback, please reach me out – oleg [at] openbom [dot] com.

Check out how OpenBOM can help you to do so. Register for OpenBOM user subscription later today 

Best, Oleg @ openbom dot com.

Let’s get to know each other better. If you live in the Greater Boston area, I invite you for a coffee together (coffee is on me). If not nearby, let’s have a virtual coffee session — I will figure out how to send you a real coffee.

Want to learn more about PLM? Check out my Beyond PLM blog and PLM Book website

Read OpenBOM customer reviews on G2 Crowd to learn what customers are saying about OpenBOM. 

Related Posts

Also on OpenBOM

4 6
24 October, 2025

As we wrap up October, I’m excited to share a new set of OpenBOM enhancements that continue our mission to...

23 October, 2025

Welcome back to Day 10 of the 30-Day OpenBOM Learning Journey! In Week 1, we covered the “why” behind OpenBOM...

22 October, 2025

Welcome to Day 9 of my 30-day OpenBOM journey. So far, we’ve explored the foundation of OpenBOM’s architecture, collaboration, and...

21 October, 2025

Welcome to Week 2 of the 30-Day OpenBOM Journey. Last week, we explored why OpenBOM exists: the philosophy, the architecture,...

20 October, 2025

When I began the 30-Day OpenBOM Challenge, my goal was simple — to create a clear, practical guide for anyone...

17 October, 2025

Welcome back to my 30-Day OpenBOM Blogging Journey! Earlier, I explored how OpenBOM connects engineering, manufacturing, and procurement through modern...

16 October, 2025

After a short break, I’m excited to continue my 30-Day OpenBOM Blogging Challenge — a journey to explore OpenBOM, its...

15 October, 2025

At OpenBOM, we’re constantly improving the way engineers and manufacturers bring data into our platform. Product information comes in many...

14 October, 2025

At OpenBOM, we’re always looking for new ways to make your experience faster, smoother, and more intuitive. Whether you’re setting...

To the top