How OpenBOM democratizes PLM systems and hides the complexity of BOM management?

Oleg Shilovitsky
Oleg Shilovitsky
23 June, 2020 | 1 min for reading
How OpenBOM democratizes PLM systems and hides the complexity of BOM management?

In this video, I discuss one of the biggest problems I’ve seen in PLM industry – complexity. Working for 20+ years in PLM, I’ve seen many companies struggling with the complexity of PLM and PDM solutions. 

So, our vision at OpenBOM was to change the status and democratize  PLM systems by following these 3 steps: 

1- Use the cloud and SaaS as a foundation. No IT, no custom deployment, you can create an account in a matter of minutes. 

2- Tight integration with Design and Engineering software. CAD systems are the foundation and the source of information for BOM and PLM. So, creating integrations can streamline the data and simplify the process. 

3- Integrate downstream processes. Starting with production planning and purchasing, OpenBOM provides an integrated mechanism to connect engineering information and drive the purchasing process (POs generation and batch planning). 

Watch the video.

Conclusion 

At OpenBOM, we laser-focused on how to use the power of modern cloud technologies to hide the complexity of data management, BOM management, and integrations and help manufacturing companies to focus on product development and manufacturing. BOM mistakes are very costly to afford. BOM mistakes fire back in additional cost, delay, and regulation mistakes. Many existing PLM products are too expensive and too complex. OpenBOM is a new kind of technology and solution. 

Check the story about how OpenBOM helped thousands of manufacturing companies to streamline data management, processes, and escape the legacy of Excel spreadsheets.

Best, Oleg @ openbom dot com.

Want to learn more about PLM? Check out my Beyond PLM blog and PLM Book website

Read OpenBOM customer reviews on G2 Crowd to learn what customers are saying about OpenBOM. 

Related Posts

Also on OpenBOM

4 6
24 November, 2026

The contract manufacturer quoted the OTP Flash Tool prototype from a BOM exported on Tuesday. On Thursday the buyer places...

23 November, 2026

Food is the best way to explain PLM and manufacturing I think “food” is the best way to explain PLM...

20 November, 2026

The board is ready for a prototype build, so you export the BOM from Altium to Excel and send it...

19 November, 2026

Engineering data does not break in one place, it breaks at every handoff I spent an hour on November 18...

19 November, 2026

A second engineer joins the drone project and asks for the files. You zip the assembly folder and send it....

16 November, 2026

The best PDM is the one engineers barely notice. They open an assembly, do their work, and the files, revisions,...

16 November, 2026

A customer described reviewing every drawing before each release to me in four words: “Frankly, that’s a nightmare.” Brad Carpenter...

12 November, 2026

Open the drone’s BOM and it looks complete: frame, arms, motors, the motor mount you locked and changed last week....

10 November, 2026

You spend the afternoon reworking the motor mount for the drone. New hole pattern, thinner wall, everything fits. You save....

To the top